Connecting the Gorge
Designing the Victoria Falls Bridge
The main credit for designing the Victoria Falls Bridge must go to George Andrew Hobson of London based consultants Sir Douglas Fox and Partners (later to become Freeman, Fox and Partners), not as is often stated, Sir Ralph Freeman, the engineer who would later design of the famous Sydney Harbour Bridge in 1932 (and also the Birchenough Bridge across the Save River in 1935). At the time of the design of the Victoria Falls Bridge, Freeman was still only an assistant in the firm, although he was involved in calculating the preliminary stresses involved with the steelwork design and was credited by Hobson for his involvement. Hobson was made a Partner in the firm in 1901 and Ralph Freeman was to also become a partner and develop the outstanding reputation of the firm, expanding its horizons worldwide.
Hobson, in his final report on the construction of the bridge, to the British Institute of Civil Engineers in 1907, records that in 1901, while in London, Rhodes was shown a sketch of the bridge as it was then proposed to be built.
"Although he had never visited the locality, he was sufficiently familiar with it from travellers' descriptions and engineers' surveys to indicate in a general way the point of crossing. He determined that passengers in the trains going over the bridge should have a view of the Falls; and as the site on which the bridge now stands is practically the only one which could fulfil this purpose, it may be said to have been chosen by him. The preliminary design of the bridge above referred to was prepared to meet Mr. Rhodes's views, and it received his approval." [Hobson, 1907]
Among considerations that had to be borne in mind was, first, an appearance that would blend with the natural beauty of the site. Then followed the more material problems of rigidity (to permit railway traffic), economy in building to keep within the limits of the contract and, finally, a method of building that dispensed altogether with scaffolding.
The Bulawayo Chronicle Annual of 1901 contained an artist's impression of the bridge, as it was then proposed, and which provoked much disbelief.
"Several kinds [of design] were considered, but the nature of the situation and the purpose of the work made it obvious that a two-hinged spandrel-braced arch was the only one worth considering, as it completely and satisfactorily answered all the requirements of the case... A steel arch of this character was therefore designed to spring from the rock walls of the Zambezi chasm, to be erected cantilever-wise simultaneously from both sides. The best, though not the earliest, example of this type is the bridge which... now carries the Grand Trunk Railway over the Niagara Gorge." [Hobson, 1907]
A final consideration was the effect of the Falls themselves, and the spray from the waterfall on the steel structure:
"Care was exercised in designing the details to ensure simplicity in all sections, and the avoidance of enclosed parts or hidden spaces anywhere in the structure... There are no cavities for holding water, nor any surfaces where moisture can condense, the air being free to circulate everywhere. All the parts, in fact, are designed to be visible to the eye, and easily accessible to the painter's brush." [Hobson, 1923]
The bridge design selected is of the braced spandrel type; the horizontal top chord is linked by verticals to the lower chord or arc. The panels so formed are braced diagonally and thus the top chord, carrying the load, relieves the arc of some of the stress. The alternative, braced-rid design the load is borne wholly by the arc.
Hobson (1907) summarises the technical specifications of the bridge:
"The bridge consists of three spans. The end span on the left bank of the river is 62 feet 6 inches, and that on the other bank 87 feet 6 inches. These spans are composed of braced girders of ordinary type, 12 feet 6 inches deep, with horizontal upper and lower chords, and divided into square panels. The girders are fixed 20 feet apart. Connected with the end posts of the central span, they unite it with each bank of the river in a direct and simple manner. The deck is horizontal, and is laid on the top chords throughout the bridge... The cross girders, spaced 12 feet 6 inches apart, rest on the top chord.
"The central span is 500 feet from centre to centre of bearings, with a rise of 90 feet. The curvature of the arched rib is parabolic. The panels, twenty in number, are 25 feet in length. The depth of the girder at the crown is 15 feet, and at the abutment 105 feet. Each main girder stands in a plane at an inclination of 1 in 8 from the perpendicular. The width between the centres of the girders is 27 feet 6 inches at the top, and 53 feet 9 inches at the springing level, and the width between the parapets 30 feet. There is a camber of 9 inches in the top chord. " [Hobson, 1907]
A key element of the design are the pin-bearings introduced at the base of the main arch, with the four "feet" hinged to steel bearings mounted on concrete abutments. Under the hot African sun the steelwork of the great arch is designed to expand and lift slightly, turning on these hinged bearings, but at the same time retaining its rigidity without buckling or becoming distorted.
Hobson (1907) expands on the details of the hinged-bearing design:
"The entire bridge, with the exception of the main bearings, weighs approximately 1,500 tons. When the live load. (1,820 tons) is added to this a vertical load of 3,320 tons has to be supported by the foundations, of which only about 280 tons is borne by the outer ends of the shore spans, the greater portion being carried by the four bearings of the principal span. The total pressure due to the horizontal thrust of the arch and stresses due to temperature and wind-pressure is more than double this load. The calculated thrust which passes through each of the four hinged bearings amounts to 1,600 tons. On this account alone these bearings constitute a very important feature in the work ; and when it is considered that their duty is also to afford the steel frame of the bridge freedom to respond to wide variations of temperature without distorting itself or causing excessive strain, their importance can hardly be exaggerated.
"In designing the bearings the first part of the problem was to provide a means whereby the stresses which pass through the main rib, a hollow structure, whose sectional dimensions are about 3 feet square, could be collected and concentrated upon a straight line at right angles, not to the rib itself but to the resultant thrust of the arch, the straight line being the centre-line of the hinge bearing-pin on which each quarter of the bridge rests. In the next place the whole of the stresses have to be redistributed from this centre-line to the rock through a series of parts composed of bearing, pedestal, base-plate, and concrete monolith.
"An essential feature of the design is the uniform distribution of the load over the various parts which compose the bearing. The load must be placed uniformly upon the length of the pin, and in like manner the pin must be supported in its bearing, so as to avoid bending. The load having thus been transmitted to the pin, it must be equally distributed through the pedestal and thence to the baseplate which rests upon the concrete, so that the load on the latter may be uniform per square foot of bearing-surface. In order that the arch may fall and rise and the top chord may expand and contract with perfect freedom through a wide range of temperature, the hinges must be set square to the longitudinal axis of the bridge, not square to the arch-rib itself. The pin and its fellow in the opposite bearing must lie in the same straight line, like the hinges of a boxlid.
"The hinge-pin is 12 inches in diameter by 5 feet 10 inches in length ; it is made from a solid steel forging accurately turned all over, and a bolt-hole is drilled through the axis. Regarded in front elevation, the whole bearings, the pins especially, appear to be of very small dimensions, compared with the superstructure they carry. But they are of solid construction, and made of the strongest and toughest materials practicable." [Hobson, 1907]

Bridge design plan by G A Hobson
The main arch, a graceful parabolic curve, has a span of 500 feet. The truss of which it is composed is 15 feet deep at the centre and 105 feet at the springing. The rise of the arch is 90 feet.
The bridge is known as a trussed arch design. Each section was to be built outwards towards the centre from the sides of the gorge. As work progressed, these half spans were supported as cantilevers by steel wire cables running through galleries cut into the rock on either bank.
Hobson expands:
"The uninitiated, looking at pictures of the half-completed bridge, with its great arms projecting from the sides of the chasm, apparently supported by nothing at all, wonder how it is done. Owing to the immense depth of the chasm and of the water below, the idea of supporting the work during erection by means of scaffolding was not to be thought of, and happily it was not necessary... The design of the bridge when completed is that of a pure arch, self-supporting on its abutments; but throughout the process of its erecting, commencing from opposite sides, each half is a cantilever, and cantilevers they remain until, their end reaching out to each other, they join in mid-air.
"Now, a cantilever is simply another name for a bracket, and a bracket requires to be well fixed to the wall, or whatever it may be that holds it. The strength of the attachment must be equal to the weight exerted by the projecting portions of the bracket, with a sufficient surplus for safety. In the present case the means of attachment were provided by a series of steel wire ropes. These were secured at the top of each cantilever, and carried to a point some distance to the rear, where they entered holes bored in the solid rock, and their looped ends were buried therein. It was simply a matter of calculation how many ropes were necessary, what their united strength should be.
"The moment the two ends of the cantilevers met each other and were properly joined together… the function of the cantilevers ceased entirely." [Hobson, 1923]
At the time of construction it was the highest structure of its kind and had the widest span of any arch in the world.
Contracting the Work
The design was completed before tenders were invited by contractors. Hobson expands:
"Throughout the preparation of the design the question of erection was considered to be of primary importance, and every detail was devised to simplify the procedure. The arrangement to erect each half of the main girders as a cantilever was not only essential in the circumstances, but was by far the easiest plan, scaffolding being both impossible and unnecessary.
"In designing the details consideration had also to be given to the available means of transport by sea and rail, and particularly to the fact that the parts for one-half of the bridge would have to be conveyed across the great chasm by means of some temporary expedient.
"The contract was divided into two parts, namely, first, the construction of the steelwork in the makers' yard and the delivery of it on board ship in a British port; and secondly, the erection of the steelwork on the site. Tenders were invited from British, American, and German firms-the majority of whom ventured only to quote a price for the first part of the work. Only two firms, which were British, seemed determined to secure both parts of the contract.
"As was to be expected from the completeness of the design and the information laid before the parties tendering, the offers received for the first part of the contract were fairly close ; whilst as regards the two firms referred to there was hardly any difference between them. They, however, differed a good deal in their estimate of the cost of erection on the site, or it would be more correct to say, of their proposed plant for that purpose." [Hobson, 1907]
Several leading firms tendered for the construction of the bridge but most were daunted by the task and in the end, only two firms, Dorman, Long & Co. and the Cleveland Bridge & Engineering Company of Darlington, were in the running.
Hobson (1923) later expanded on the process:
" To go back to the time when one’s mind was almost wholly occupied in the work of design, and in the preparation of the specification and contract, there is a recollection of a haunting fear that some German or American firm would secure the contract... I may here observe that the fear of British firms shrinking from the task in the present case was well grounded, for one of the best known and highly reputed among them, after having expressed a desire to compete for the work, and having obtained all the needed information, turned craven at the last moment and failed to tender. This in spite of the fact that much thought had been given by the engineers to the idea of eliminating from the situation, as far as it was possible to do so, all the unknown, doubtful or incalculable factors associated with work of this nature. Although the site was in a remote part of the world, and there were many difficulties, the way was made easy for the contractor. For instance, all the preliminary clearing of the ground, and the excavation of the rock for the foundations, was done for him. He was provided with free transport to the spot of all the material for the bridge; houses were built for the workmen; and, in addition to all these efforts to save the contractor trouble and reduce his risk, a new and powerful apparatus was provided for the transport across the hitherto impassable gorge of one half of the material for the construction of the bridge, it being an essential feature of the engineers’ design that the structure be built out simultaneously from each bank. The apparatus referred to is, of course, the now famous cableway [known as ‘The Blondin’].
"Fortunately, all our British firms were not broken reeds; but it is a fact that only two of their number, by submitting a complete and reasonable offer, evinced any keen desire to participate in the undertaking. To the honour of The Cleveland Bridge and Engineering Company, of Darlington, personified by Mr Charles F Dixon, their managing director, who succeeded in getting the contract, and Messrs. Dorman Long and Company, of Middlesbrough, who were equally bent upon it and ran their rivals fairly close, that the saving of our British reputation for enterprise was due." [Hobson, 1923]
The railway contractors, Pauling & Co, also tendered for the contract. George Pauling was disappointed to loose the contract, but contented himself with the belief that the winning bid was too low, and that their was little profit to be gains. He wrote in his autobiography 'Chronicles of a Contractor':
"My firm had sent in a tender but it was too high; their tender, on the other hand, was too low, and I hardly think they made a profit on the work. I had had so great a connection with railway work in Rhodesia that I was sorry we had not the honour of building the bridge, but honour of that kind can be purchased at too heavy a price." [Pauling, 1926]
In May 1903 both parts of the contract were awarded to The Cleveland Bridge Company, to construct and erect the Victoria Falls Bridge for a price of £72,000. The company was also destined, thirty years later, to build another bridge across the Zambezi, the Lower Zambezi Bridge at Sena, Mozambique, with a total length of two and three quarter miles.
The cost of the work was identified approximately as (£) :-
Steelwork; 21,000
Transport; 12,700
Erection; 27,000
Cableway; 4,000
Spare rope, conveyor and tires; 750
Excavations, exclusive of railway cutting, about; 6,550
Total; 72,000
Hobson writes:
"It was then anticipated that the construction of the railway up to the Falls would be completed by the end of that year or the beginning of the next, but unexpected difficulties were met with on the route, which caused a delay of 4 months. The rail-head actually reached the site at the end of May, 1904. Until then the transportation of the bridge-material was impossible." [Hobson, 1907]
The bridge was made, and assembled in sections to ensure accuracy, at the steel works in Darlington, England, and shipped in knocked down pieces to Beira on the S.S. Cromwell and then put on the Beira and Mashonaland Railway to Bulawayo, and on to the Victoria Falls on the new rail-line. With the view to hastening the arrival of the steelwork and its erection, the Railway company itself arranged for the transport of the materials. Mr Macrae was the forwarding contractor for the despatch of materials from Bulawayo.
"With few exceptions the bridge is constructed of rolled steel manufactured in England by the Siemens open-hearth acid process. All the plates and the principal angles were made by the Consett Iron Company, Durham. Material and workmanship were subjected to rigid inspection and proved to be of uniformly high character. The breaking stress of the tested pieces averaged 29.6 inches, and the limit of elasticity 60 per cent., all within a 2 per cent. margin of variation. The exceptions referred to consisted of steel forgings. No cast iron or cast steel was employed in the work. " [Hobson, 1907]
The location of the bridge, where it is frequently saturated by spray, demanded the inclusion of some rather interesting design features. To ensure that rust would never become established there is no portion of the bridge that cannot be examined by the human eye and no place that is not accessible to the painter's brush. There are no 'cups' or hollows that might hold water and all the important members of the structure can be entered by a man who can crawl through them.
"After a thorough cleansing and treatment with red-lead and linseed-oil (ascertained to be pure in quality), both before shipment and after erection, the steelwork was covered with three coats of Torbay paint of a specially selected silver-grey colour. This particular shade was chosen because a patch of rust in it will appear conspicuous by contrast. It has the further advantage of absorbing little of the heat of the sun. " [Hobson, 1907]
Hobson (1907) describes further:
"In order to check the accuracy and completeness of the work done in the bridge-yard, the erection on the contractor's premises of the whole of the work in sections was determined upon, and it may be here stated that this was so effectively performed that... when the steelwork was erected at the Victoria Falls, all the members met accurately together in their respective positions." [Hobson, 1907]
The Bridge Builders
Georges C Imbault, a young gifted French engineer working with The Cleveland Bridge Company, was appointed as their Chief Construction Engineer on site. He travelled out by steamliner to Cape Town and by rail to Bulawayo where he was joined by Sir Charles Metcalfe and Mr Stephen F Townsend, Resident Engineer for Rhodesia Railways, and together they travelled on to the Falls. At this time the construction of the railway was still more than one hundred miles short from its destination of the Falls, and they had a rough trek overland to complete their journey. On 2 September, 1903, Imbault viewed the site for the first time, assessing the scale of his task. It is recorded that Sir George Farrar, who was also there at the time, shot a fine buck within a few yards of the bridge site.
Colonel Frank Rhodes, Cecil's brother, apparently expressed strong displeasure when he heard that a Frenchman was to in charge of erecting the bridge, saying "Cecil would never have allowed anyone but a British engineer"! Imbault had been selected because of his experience with cables and overhead electric conveyors, an essential element in the construction of the bridge, and his selection was amply justified.
Mr S F Townsend was originally on the staff of the Cape Government Railways, and had been responsible for the construction of the Orange River Bridge, then the longest bridge in Africa. He was appointed to the Rhodesia Railways by Cecil Rhodes, on the start of the great scheme from Vryburg, and continued with the company as Chief Resident Engineer, based in Bulawayo, until after the main line reached the Congo Border in 1909.
Mr William Tower was chief assistant engineer to Townsend, and had been in charge of most of the surveying north from Vryburg. He was head of construction between Bulawayo and Salisbury, and for part of the line from Bulawayo to the Victoria Falls, where he was Resident Engineer for the construction of the bridge. His assistants at the start of the works were Mr C Everard and Mr Beresford Fox.
A construction yard was established on the south bank, where all bridge materials were stored. A temporary camp for the bridge construction engineers was set in early 1904 about a kilometre from the construction yard, on the south side of the old track leading to Clark's Ferry, and named Tower's Camp. Beresford Fox oversaw construction of the camp and put up fifteen to twenty huts for the benefit of the railway and bridge construction workers. Another camp was later established on the left bank, known varyingly as Imbault's or Salmon's (one of the railway surveyors) camp.
Victoria Falls Bridge Construction Camp; Tower's Camp on the south bank
The Railway company also oversaw the excavation of the rock in preparation for the bridge foundations, and which was contracted to a Bulawayo based company. A small group of five Europeans, assisted by a team of Africans, cleared the rubble from the slopes of the gorge and exposed the hard rock foundations in preparation for the mass of steel it was to carry.
Connecting the Gorge
At that time the nearest possible point of transit was cross the river above the Falls at Giese's Drift, just above the Devil's Cataract on the south side of the river. From this point a canoe was needed to cross to Maramba Drift on the northern bank, and then back down to the bridge site, a distance of three miles or more, taking several hours, and not without its dangers - wild animals roamed the area, as they still do today.
One of the first tasks was to establish a cable system across the gorge. This was achieved in October 1903 by firing a rocket across the gorge carrying with it a string. When this was secured on the other side, a stronger cord was taken across and finally a telephone wire, next a marked wire was passed across and a string put on it by means of a spring balance to compute the side or sag of the wire. Before the rocket was fired, attempts had been made to fly a string across by means of a kite, but this ingenious effort was foiled by the eddies and currents of air from the tumultuous waters which tossed the kite in every direction but the right one. Another problem was mist from the Falls which hampered the accurate surveying required.
At the third trial the rocket dropped in a position which enabled the line to be secured. By means of the line a rope was drawn across, and by means of the rope, followed finally by a 3/8th inch stranded rope of steel. This was passed over a 12-inch pulley fixed in a stout log which in turn was firmly bedded in the rock on the very edge of the cliff. The tactics were then reversed, and when the free end of the pulley rope was dragged back to the south bank, it was pulled tight and taken twice round the barrel of a windlass and securely spliced to its other end. The position of this was downstream, a few yards from the bridge site, and this small cable system successfully transported small loads, tools and even people throughout the building of the bridge. A telephone line was also established across the gorge for effective communication.
After overseeing these initial preparations, Imbault returned to England in October 1903.
The Bosun's Chair
Passengers were taken over one at a time on a bosun's chair suspended from small pulleys running on the cable which was worked by a hand winch. For safety there was attached a canvas bag which could be strapped round the legs and across the chest. H F Varian, one of Pauling's engineers who worked on the bridge, wrote:
"A wooden box, five feet cubed, was slung on two steel sheaves from the steel rope, and drawn by a light steel wire... It was a primitive mode of transport. The supporting wire sagged ominously in the middle of the gorge, and if one disliked heights, there was plenty of time to brood in transit as the flimsy box jerked its way across. " [Varian, 1953]
Mr Beresford Fox was responsible for setting up the cable system, and got the short-straw to make the first passage across the chasm. In a letter to his father Sir Francis Fox in 1903 he wrote:
"We could not obtain a trolley in Bulawayo and so, temporarily, we have to do the best we can: the present arrangement is safe, but not good mechanically. As they tied me into the bosun's chair I must admit to feeling a bit strange in relying absolutely on my own calculations for my safety. The chair is a piece of wood suspended by four ropes, with a canvas back and a sack and board as a foot-rest. Of course one is so tied in that were you to lose consciousness you could not fall out; this precaution, for some people is advisable." [Hyder Consulting, 2007]
By means of this simple system, engineers and workmen were to cross the chasm daily, and foodstuffs and material were transported to the northern side.
Charles Beresford Fox crossing the gorge for the first time in the 'Bosun's chair', November 1903.
In March 1904 Imbault travelled back to the site with the first contingent of British workmen, mainly English engineers. Among the group was A T Prince, assistant engineer, who would later publish one of the first accounts of the work. Writing in the American publication The World's Work in 1906 he records:
"We travelled from Cape Town to Bulawayo in the train de luxe, which is wonderfully comfortable and rather upsets the ideas of those who come to Africa expecting to have to rough it. There are many trains in Europe which would suffer badly in comparison.
"From the rail-head, however, we had to finish our journey part of the way sitting in the trucks of a construction train and part by post cart. The post cart trip of about thirty-five miles [56km] occupied two days instead of ten hours, as we had expected and provided for. On the second night, from a distance of five miles, as we approached, we had a superb view of the spray from the fall lighted up by a full moon. This spray column, we afterwards found by measurement, rises more than two thousand feet into the air on a calm day with the river in flood.
"On the following morning we saw the falls themselves, and those who have not been fortunate enough to see them can form small idea of their grandeur. " [Prince, 1906]
The Blondin
With the railhead approaching the Victoria Falls, heavy construction materials could at last be transported to the site. Imbault's next task was the installation of a more powerful cable system to transport the large volume of building materials needed to the north bank.
The Blondin
Hobson recalls:
"In July, 1903, tenders had been invited for a cableway to span a distance of 870 feet [265.18 metres] and carry a load of 10 tons net. The conveyor was specified to be capable of lifting and lowering as well as travelling with this load, and to be operated by means of electricity."
"In effect the principle of the apparatus is that of an overhead travelling crane in a workshop, but instead of running on a solid rail it runs on a wire rope; the driver sits in the travelling carriage, and from there he controls the lifting, lowering, and travelling movements."
"The design at the time was comparatively new, and no apparatus of the kind had hitherto been made on such a large scale. It was therefore regarded-in some quarters-with ill-concealed suspicion." [Hobson, 1907]
Situated on the upstream side of the bridge, the apparatus was installed and in working order by the 28th July 1904. Before the transporter could be used for the first time it was necessary to clear the cable of various pulleys that had been used in positioning it and which had all gravitated to the lowest position, over the centre of the gorge. The Chief Engineer, Imbault, had to undertake the dangerous work himself, as one of the engineers recalled:
"Despite the offer of a bonus, not one of the workers would undertake the job and finally the chief engineer had to do it himself... it was an eerie sensation watching this man standing on a narrow plank in front of the gently swaying machine, 450 feet [137 metres] in the air, using both hands to undo the steel lashings, and passing the pulleys one by one to the driver at the back. A moment of vertigo, a false balance, and certain death. Truly he was nerveless." [Powell, 1930]
The electronic transporter system became known as ‘the Blondin’ after the daredevil tightrope walker Charles Blondin who had famously crossed the Niagara Falls by rope in 1859. Electricity came from a portable steam-driven engine and dynamo which was located near the construction yard on the south bank. In addition to transporting half of the steelwork for the bridge across the gorge, over 40 miles of track materials were also transported using the Blondin. This allowed the railway construction gangs to continue the development of the line north before the bridge itself was completed.
The 'Jack Tar'
It was desirable that an light shunting engine be based on the north side of the Zambezi whilst the bridge was being completed, and so the 19 ton 'Jack Tar' locomotive was dismantled and transported over the gorge piece by piece by means of the Blondin cableway. The boiler and lighter parts sent over first. What was left, the body frame and cylinders, weighed twelve tons and had to be transported in one piece. Varian describes how the cable sagged under this load and dangled over the gorge with a fourteen metre drop in the cable. There it hung for three hours as the Blondin's engine struggled to cope with its weight, until boosting of the power in the electrical plant and by other means the carrier slowly managed to pull itself to the other side. The driver sitting in his little seat with a drop of 350 feet below him is said to have coolly smoked throughout his ordeal.
The Jack Tar
Built in 1889 by Manning Wardle & Co of Leeds, Yorkshire, the Jack Tar engine was purchased by Pauling & Co, the railway construction contractors, in 1896. It was shipped to Beira and assembled at Umtali, where it was used on the widening of the Beira railway, before being transferred to Victoria Falls in 1904-1905.
The Jack Tar pulled the first train in Northern Rhodesia, over a short two mile track built in a day by the railway construction workers.
The Jack Tar made further history by being the first locomotive engine to cross the completed bridge, although the official first train service was only on the official opening several months later.
When working trucks over one night soon after the opening of the temporary rail-line over the bridge, its side rods killed a leopard crouching on the walkway beside the track. Perhaps injured or ill, or without space to run, the animal refused to flee from the advancing train and its skull was crushed.
After the bridge was finished the Jack Tar returned to Beira for light shunting duties. In 1927 it was transferred to Bulawayo. In 1935 re-boilering was necessary and other changes made in appearance, including the provision of a brass dome and cap to the chimney, while a new fully enclosed cab was fitted in place of the original open shelter. The black livery was replaced with dark green, lined with yellow. One loss was the little anchor fitted to the front of the chimney.
By 1942 the locomotive was moved to Umtali, before finally being withdrawn from service. Exhibited at the Rhodes Centenary Exhibition at Bulawayo in 1953, it was later loaned to the Umtali Museum. The engine is now fully restored and part of the Bulawayo Railway Museum collection.
|
Recommended Reading
Fox, Francis, Sir. (1924) Sixty-three years of engineering, scientific and social work. London, J. Murray
Hobson, G A (1905) The Victoria Falls Bridge, The African World, Vol 3, 9 December, p107
Hobson, G (1907) The Victoria Falls Bridge. Institution of Civil Engineers, Session 1906-1907, Part IV, Section 1. Minutes of Proceedings 19 March, 1907 (Paper No 3675). Volume 170,January 1907, Pages 1–49.
Hobson, G (1923) The Great Zambesi Bridge - The Story of a Famous Engineering Feat. In Weinthal, L
Hyder Consulting (2007) Footprints on a Global Landscape – 100 years of improving the built environment. Hyder Consulting.
Pauling, G. (1926) Chronicles of a Contractor
Roberts P (2016) Sun, Steel and Spray - A history of the Victoria Falls Bridge. Zambezi Book Company.
Varian, H F (1953) Some African Milestones Wheatley : George Ronald. (Reprinted 1973 Books of Rhodesia).
Weinthal, L (1923) The Story of the Cape to Cairo Railway and River Route from 1887–1922 (Pioneer Publishing Co)
Further Reading
Roberts P (2020) Sun, Steel and Spray - A history of the Victoria Falls Bridge. Zambezi Book Company.
|
|
Search www.tothevictoriafalls.com:
|
'To The Victoria Falls' aims to bring you the wonder of the Victoria Falls through a look at its natural and human history.
This website has been developed using information researched from a wide variety of sources, including books, magazines and websites etc too numerous to mention or credit individually, although many key references are identified on our References page. Many of the images contained in this website have been sourced from old photographic postcards and publications and no infringement of copyright is intended. We warmly welcome any donations of photographs or information to this website.
Website text © Copyright Peter Roberts 2012, All Rights Reserved.
Webpage design by EcoElements Digital Media Solutions
|